Built with care, verified with expertise.
The project involves the revitalization of a complete urban sector in Abu Dhabi through a comprehensive redevelopment program. The scope of work includes demolition, renovation, new construction, and infrastructure upgrades to transform the area into a vibrant, mixed-use destination.
The works comprise the demolition of seven existing 20-storey buildings, as well as the renovation of 38 villas for adaptive reuse as retail, dining, and recreational facilities. The development also includes the construction of elevated parks, along with significant infrastructure works encompassing road networks and dry and wet utilities, in addition to extensive landscape development. Construction supervision services include the review and approval of technical and commercial submittals, as well as the coordination and management of contractors to ensure the project is delivered on schedule, within scope, and to the required quality standards.
The project provides design and consultancy services for the development of walkways and cycle tracks in Zayed City, located within the Al Dhafra Region. It encompasses the planning and delivery of pedestrian and cycling infrastructure, integrated with landscape enhancement works, civil engineering, and supporting infrastructure across the city.
The project includes approximately 68 km of dedicated cycle tracks, 68 km of pedestrian walkways, 10 km of shared pedestrian paths, and 10 km of mountain biking trails. The scope of works covers comprehensive landscape development, including softscape and hardscape elements, street furniture, and shade structures. It also includes the design and implementation of lighting systems, irrigation reservoirs and pumping stations, irrigation networks, stormwater drainage systems, and all associated civil and infrastructure works.
The project involves the development of 15 parks across Al Ain City. The scope includes comprehensive softscape and hardscape works, along with the installation of irrigation systems and utility networks..
In addition, stormwater management measures are integrated into the design through the use of geocells in selected areas, enhancing water retention capacity and reducing flood risk. All parks are designed to provide safe, accessible, and engaging recreational environments, incorporating well-equipped play areas and supporting community facilities.
The scope of work, extending over approximately 5 km, comprised both design and supervision services. The project involved widening the Corniche using mechanically stabilized earth (MSE) wall systems to facilitate the creation of additional parking areas.
It also included the development of public amenities such as playgrounds and toilet facilities, along with the construction of a dedicated cycle track to improve accessibility and enhance the recreational use of the waterfront.